262-property perimeter
Who owned each finca, when, under what instrument, and what later transfer or use affected it?
UNITARY CASE INTERFACE · EVIDENCE BEFORE CONCLUSION
One public interface for the connected Sun Park record. It does not collapse different legal entities, proceedings, assets or evidential statuses. It shows how the systems interact, what is documented, what remains alleged or open, who can answer the finite questions, and what evidence could change the interpretation.
The central discipline is separation without fragmentation. Registered title, CEXP participation, the insolvency estate, material control, investment finance and institutional supervision are different legal/evidential systems; they become intelligible only when their interactions are reconciled.
Who owned each finca, when, under what instrument, and what later transfer or use affected it?
LPB was the debtor; CEXP was outside the estate. The open valuation question is what legally and economically attributable CEXP/productive-unit value belonged in the insolvency analysis.
What was known, received, valued, protected, rejected, acted upon or left unresolved at each decision point, including creditor-assignment and estate-benefit questions?
Separate creditor status, physical access/control, possession, later title and the treatment of Matkator and third-party rights.
Reconcile title, project representations, eligible expenditure, Series F/G, incentives and later operation without treating coexistence as proof of misuse.
Courts, CGPJ, Fiscalía, tax and transparency bodies, local administrations, supervisors and professional firms hold different parts of the documentary answer.
Every important public conclusion should be reducible to a source-status question. The site uses the following grammar; a stronger label requires stronger evidence.
Which contemporaneous record reconciled fragmented registered title, private/Matkator units, the 2020 whole-project investor image and the later award/deed?
What was LPB’s legally attributable value in or against CEXP, and how was participation, income, receivables, operating infrastructure and going-concern value treated?
For each CEXP/value document: delivery or LexNET receipt → docket entry → response/order → later reliance → economic consequence.
What did LPB obtain or lose when the PH122→CAM assignment, deed-and-price information route and possible Article 1535 option were treated across the two judicial lanes? A possible claim is not assumed to have been legally viable.
How were ACTÚA, the separate GESVALT critique, the later ECO appraisal, physical condition, title perimeter and operating economics reconciled for their different purposes?
What exact expenditure and legal scope did Series F/G and the identified idoneidad / AEAT antecedents cover, and how were overlapping financing/support layers reconciled?
What does the Cuatrecasas mandate → handover → recovery → ETJ sequence establish, and what remains merely alleged? ICAM archives on limitation or competence are not merits rulings.
Which authority or professional actor had competence, notice and the ability to obtain the missing record, and what reasoned response exists?
This is not a silence-equals-liability table. It identifies the finite documentary question and the current public route where the latest controlled status should be checked.