CONCURSO 36/2012 · FORENSIC COMPARATOR · SOURCE STATUS FIRST

ACTÚA versus GESVALT: put the reports against each other, then test what each actor did with the conflict.

This page compares value, purpose, perimeter, access, occupation, condition, sample, depreciation and institutional use on one surface. It does not pretend that different valuation purposes are directly interchangeable.

Project allegation. Project Sun Rock alleges that ACTÚA was materially false, fraudulent and misleading in preparation/use; that private actors generated or supplied material components; that the Insolvency Administrator adopted, operationalised or failed to correct material parts; and that judicial acts or failures of effective supervision allowed disputed premises to migrate toward CAM-favouring control and title. These are allegations and causation hypotheses, not adjudicated findings of fraud, concert, corruption or judicial wrongdoing.

12 SEP 2026 · ^SUN_PARK_ACTUA_DOCUMENT_USE_AUDIT_20260912

ACTÚA under evidentiary examination

The investigation concerns preparation, repeated use and institutional treatment of the valuation. The project alleges that harmful unit-level conduct was turned into a depressed hotel narrative and then used to obtain control or benefit. This section shows the documentary support, competing explanations and missing links.

9 March 2018: what the recovered filing proves

Aweswell: 14:00, Peninsular time. Two annexes match the receipt hashes; the circulated principal does not. LPB: 12:11. Receipt recovered, but none of its three exact payloads has yet been matched. Signature-certificate validation has not been performed.

Contrary expert material was filed before 16 April

The 9 March 2018, 14:00 LexNET receipt identifies two annexes whose hashes match the recovered GESVALT appraisal and technical criticism. This advances the chronology from private correspondence to a documented submission to the court.

Court submission does not establish personal reading, acceptance or deliberate disregard by a particular judge or administrator.

EVID-2018-LEXNET-001 · EVID-2018-ANNEX-001 · EVID-2018-ANNEX-002

The two-block allegation existed by 20 February

Patricia told GESVALT that two minority blocks were closed while the rest traded. GESVALT raised its own preliminary technical criticism the next day. Keep the client's account and the professional's opinion distinct.

The February email does not identify every unit, prove the alleged cause of closure, or locate ACTÚA's photographs.

EVID-2018-VUSE-003 · EVID-2018-VUSE-004

Test the proposed return of the evidence against its users

If identified controllers caused or prolonged deterioration, supplied an unrepresentative picture, and knowingly used it to depress a transaction value or block an operating exit, their own condition evidence could also help prove the earlier harm. Each link needs its own source.

ACTÚA's mixed photographs, unknown occupation, incomplete access and information about at least 61 units do not identify all owners, establish the 44/61 overlap, or prove a common plan.

EVID-2018-ANNEX-002 · EVID-2018-VUSE-008

Apply the same scrutiny to GESVALT

Preserve its rejection of quota-only allocation, report/addressee corrections, later access requirements, special assumptions and its 2025 denial of knowledge of the described ORION/CAM matter. These limit what can fairly be inferred from its work.

Different purposes or amounts alone prove neither fraud by ACTÚA nor correctness of every GESVALT input. A proposed appraisal is not a completed appraisal.

EVID-2018-VUSE-002 · EVID-2018-VUSE-005 · EVID-2020-VUSE-001 · EVID-2021-VUSE-001 · EVID-2025-VUSE-001

The alleged chain: test every link

  1. Unit, owner/controller and duty at the relevant date
  2. Actual non-compliance, access restriction or deterioration
  3. Information supplied and condition extrapolated into ACTÚA
  4. Knowing use in an offer, plan or decision
  5. Control, lost trading, title transfer or later benefit

Separate each actor and each decision

ACTÚA: preparation

Who commissioned, paid, supplied the 61-unit information, arranged access and selected the photographs?

15 January report; 3 April response; disclosed access and occupation limits; contemporaneous GESVALT criticism.

Obtain engagement, drafts, native photos, complete inspection notes and input schedules. Separate method error from knowing falsity.

Acosta Matos: use and benefit

Which exact report/version supported each offer, pleading and claimed right, and what contrary information had reached the relevant person?

CAM offer, response and filed annexes; current comparison separates the 159-unit branch from the 31-finca branch.

Trace delivery, authorisation, ownership/control at date, price schedules and any instruction to ACTÚA. Keep S.A./S.L. source identity differences explicit.

Francisco de Borja Rodríguez-Batllori Laffitte: administration

What reached the administrator before each plan, recommendation, response, control decision and implementation?

Plan and annexes, dated correspondence and judicial record; the recovered filing narrows the notice inquiry.

Establish receipt, applicable estate duty, available corrective step, exact act or omission, knowledge and effect. A filed document is not proof of personal receipt.

Court: approval, reasons and later steps

What was actually before the court at each decision, and what did the decision decide about the disputed valuation?

9 March filings precede the 16 April order. A 17 April response cannot cause the earlier order. Preserve the later protective stay and refusal to convalidate.

Obtain the indexed record, service/availability trail, exact reasons and appeal history. Test the applicable criminal threshold and knowledge separately from adverse outcomes or legal error.

Montelanza / Molina-linked owners: historic conduct

Which individual had which unit, enforceable duty, control and actual conduct before and after 2008?

Historic title/community sources, 2011 correspondence and the 2018 allegations form leads, not a collective finding against all owners.

Recover the complete 2008 instruments, performance and breach trail, valid CP resolutions, access/maintenance records and dated unit/title crosswalk. Do not conflate Israeli MULTIMATRIX LTD with the separately locked UK entity.

Later recipients and beneficiaries

Did a later title, financing, investor, tax or public-funding decision actually rely on ACTÚA, a derivative figure or a concealed premise?

Existing title, RICPE/CNMV and public-support tracks identify later steps. The 2019–2026 correspondence supplies questions and stated limits.

Obtain the exact diligence pack, recipients, investment/credit decision and disclosure duty. Later benefit alone does not prove receipt or prior coordination.

Evidence that could weaken or defeat the theory

Lawful community enforcement, real deterioration, a competent purpose-specific valuation, incomplete access, independent judicial reasoning or a materially different later transaction must be tested. The mixed ACTÚA photos weaken a claim that all images show only Blocks 4–5. Blocks 4+5 have 44 units; numerical agreement alone does not identify GESVALT's approximately 44 poor-condition units or ACTÚA's at least 61. Preserve the 26 June 2018 stay, 24 October 2019 refusal to convalidate and adverse criminal/appeal outcomes, while separately checking practical restoration. The client's allegations and later proposed financing do not certify wrongdoing or completed funding.

Measure the harm across the hotel

Test capacity, guest access, common services, maintenance, safety, compliance, shared costs, net trading income, financing opportunity and title value against a dated counterfactual. Identify the affected legal holder and avoid counting the same loss as repair cost, lost income and permanent capital loss. Integration explains possible transmission of harm; it does not establish that every alleged act caused every loss.

The next decisive records

  1. Recover both exact filed principals and LPB's two exact annexes; obtain the court index, service and receipt trail. Preserve the matched Aweswell annexes.
  2. Recover ACTÚA's engagement, payment, drafts, original photos, access records and the source and identities of at least 61 units.
  3. Recover the complete 2008 sale/option obligations and performance evidence, plus the 23 December 2011 administrator crosswalk annex. Match each alleged breach to the relevant person and date.
  4. For every later act, identify actual reliance and a lawful available alternative; quantify lost net trading, repair and title effects without double counting or assuming financing completion.
Source register and proof limits
EVID-2018-VUSE-001 · 30 January: integrated legal and operating regime raised

2018-01-30

EVID-2018-VUSE-002 · 5 February: quota-only allocation rejected

2018-02-05

EVID-2018-VUSE-003 · 20 February: two-block closure allegation

2018-02-20

EVID-2018-VUSE-004 · 21 February: preliminary technical criticism

2018-02-21

EVID-2018-VUSE-005 · 8–9 March: correction and addressee chain

2018-03-08/2018-03-09

EVID-2018-LEXNET-001 · Aweswell LexNET receipt

2018-03-09T14:00:00+01:00

document_sha256: b4f4d7bc2a8a252a5d1e47b21e7d5d2a326f25cd2013cf36bb52f61640b64339

EVID-2018-ANNEX-001 · Filed annex 1: RICS market appraisal

2018-03-01

document_sha256: 9056a58355dd1159c13f4c5907cab744310bbe40a7b1c18fb31e66872c799c4a

receipt_sha1: 5fe0169a820defbec772a512ec149a31e4d63f9e

EVID-2018-ANNEX-002 · Filed annex 2: critical report

2018-03-01

document_sha256: f81b0bcf41e92361893e85ba47b92e68735647d6fa6b7bcf2a96e8711ba04bf0

receipt_sha1: 6cbf0f7f088e14b8f89c9d91360494ce0c4c8812

EVID-2018-LEXNET-002 · LPB LexNET receipt

2018-03-09T12:11:00+01:00

document_sha256: e308879ed32b1eba6f89f50509c698e5506ae896c3489734920a56471593e136

EVID-2018-VUSE-006 · Aweswell circulated principal: hash mismatch

2018-03-12

document_sha256: 0eab87583501da153658829dffa03b58f66239742877ff9a5dabf70f00606f8e

EVID-2018-VUSE-007 · LPB circulated principal: hash mismatch

2018-03-06

document_sha256: 129c5d18ea9bcc8e97404e1bbef2b63613fab38b38b0efb555d89a0bd625c8f3

EVID-2018-VUSE-008 · 17–18 April: procedural circulation and access questions

2018-04-17/2018-04-18

EVID-2019-VUSE-001 · 2019: valuation purposes and proposed financing

2019-08-23/2019-09-20

EVID-2020-VUSE-001 · 2020: access limits for proposed damages work

2020-09-16

EVID-2021-VUSE-001 · 2021: desktop scope and special assumptions

2021-12-13/2021-12-20

EVID-2025-VUSE-001 · 2025: GESVALT denial of knowledge

2025-01-20

EVID-2026-VUSE-001 · 2026: owner's correction request

2026-08-25

Same physical hotel · different dates/purposes · comparison is evidentiary, not “apples to apples”

The side-by-side record

ACTÚA · 15 Jan 2018

RequesterConstrucciones Acosta Matos S.A.
PurposeAdvice / stated fair value.
Perimeter262 independent registry properties treated as one functional unit.
OccupationSITUACIÓN Y OCUPACIÓN: Se desconoce. Unknown is not unoccupied.
Whole-complex figure€9.776m
Depreciation57.14% physical depreciation; 3-Apr counter-report defends application to the total functional unit.
Interior access3-Apr counter-report says ACTÚA could not access the interior of 100% of the complex.
“At least 61”conforme se nos informa: ACTÚA attributes the unrefurbished-unit proposition to supplied information. Provider/list remains unresolved.
Visible photographs13 substantive images; only 3 clear apartment interiors, none visibly identified by apartment/finca/block/owner/access provider. The record is mixed, not uniformly negative: people are visible in a reception/common-area image and an intact-looking front office is also shown.

GESVALT controls · 2017–2018

30 Jun 2017 RICS€26.400m market value, 10-year DCF, whole-hotel/integrated economic-unit treatment.
1 Mar 2018 critiqueProfessional expert criticism, not a new market/mortgage valuation.
Condition critiqueApproximately 44 poor-condition units, remainder described as usable; challenges the general physical-condition narrative.
Depreciation critiqueChallenges uniform 57.14% depreciation and the absence of property-by-property depreciation treatment.
23 May inspectionSeparate ECO mortgage-purpose workstream for Aweswell.
7 Jun 2018 ECO€25.647m
Condition / occupationTerminado · Con ocupante.
Perimeter262 independent registry properties treated as one exploitation unit; value conditioned on the set functioning together.
BoundaryLater inspection and different purpose do not prove every January factual premise was identical.

Magnitude only — not a methodology equivalence

ACTÚA · Jan 2018
€9.776m
GESVALT RICS · Jun 2017
€26.400m
GESVALT ECO · Jun 2018
€25.647m

ACTÚA is about 37.0% of the RICS figure and 38.1% of the ECO figure. The purpose/date/method labels are mandatory: the visual gap is an investigative signal, not proof of fraud.

Accuracy correction that strengthens the case. The earlier strong theory that ACTÚA's visible appendix consisted largely or wholly of negative Blocks 4–5 imagery is weakened/falsified as stated by the recovered original report. The surviving issue is stronger because it is testable: representativeness and extrapolation. Which interiors were inspected, who supplied access and the “at least 61” information, which apartments are in the three interior photographs, and why was 57.14% applied to the whole functional unit?

Three ACTÚA/CAM numbers must never be collapsed

€9.776m

ACTÚA whole complex

Wider physical/economic perimeter than LPB's estate.

€7.065m

CAM offer · stated 159-unit branch

Recovered 15-Jan offer: €7,065,384.42.

€6.608m

AC Plan / later AP · 159

€6,607,551.87 for apparently the same 159-unit perimeter.

Unresolved same-perimeter gap: €457,832.55. The exact ACTÚA Annex I, schedules, valuation/correction dates and version history must reconcile it. The original CAM second-property list also duplicates finca 8579 and omits 8519; later judicial descriptions use the corrected range. Preserve the source defect rather than silently repairing history.

60 / at least 61 / 61 in “two blocks” / ≈44 / Blocks 4+5 = 44

QuantitySource/statusWhat it does not prove
602017 working/historical acquisition-status reconstruction; native source still to recover.Not a physical-condition count by itself.
at least 61ACTÚA 3-Apr: unrefurbished according to information supplied to it.Provider/list unknown; not identified as Blocks 4–5.
61 / two blocks17-Apr-2018 client-side communication to Cuatrecasas.Party characterization, not ACTÚA proof of geography.
≈44 poorGESVALT professional opinion in critical report.Unit identities remain open.
Blocks 4+5 = 44Corrected architectural block capacity.Numerical alignment is a lead, not proof GESVALT meant those blocks; “two blocks / 61” cannot literally equal Blocks 4+5 capacity.

Falsification chain: ACTÚA photo → exact apartment → finca → corrected block → owner/controller at date → access provider → operating/maintenance condition → source supplied to ACTÚA.

Reverse-engineer the valuation through the entire conversion storyline

HISTORIC FRAGMENTATION / ALLEGED UNIT INTERFERENCE → ACTÚA INPUTS / SAMPLE → CAM OFFER → AC PLAN → 16-APR JUDICIAL GATE → SECURITY / ACCESS → 7-JUNE MATERIAL CONTROL → ONA / FINANCE COUNTERFACTUAL → 2019 NON-CONVALIDATION / RESTORATION QUESTION → 2021 COMPETITION → €13.168m DACIÓN → CAM / HNT → RICPE / RIC → PUBLIC-SUPPORT TRACKS → MYND CURRENT BENEFIT

The Project's self-created-distress hypothesis is that a limited unit-condition/closure problem may have been extrapolated into whole-hotel distress and that later material control may then have impaired operation, diligence and finance, producing a feedback loop. The recovered ACTÚA photographs do not prove a Blocks 4–5 cluster. Every arrow remains a proposition to prove or disprove actor by actor.

Maximum provable attribution — actor-specific prosecutorial matrix

Actor/capacityStrongest present prosecution theory to testProof still required before criminal attribution
Private / CAM / Community-side actorsCommissioning/information/access/Community-control/offer/implementation/beneficiary-side chain: who instructed ACTÚA, supplied the at-least-61 information and access, used the valuation in the acquisition route, participated in 7-June control, made pre-title representations and received downstream benefit.Exact engagement/invoice/instructions; provider/list; keys/access and attendees; unit-by-unit owner/control/condition history; actor-specific security/control acts; knowledge and intent; causal benefit. Relationship and later benefit alone are insufficient.
Insolvency AdministratorNot a spectator: creditor-verification, Plan/recommendation, valuation-reconciliation, security/access, ONA comparison, Protocol 2150, later competition, Protocol 457 and accounting were institutional gates. Test necessary cooperation, commission by omission, disloyal-administration or procedural-fraud relevance only where offence elements fit.What he actually received and verified; treatment of GESVALT and €457,832.55 mismatch; exact authority and response to control; capacity to prevent/reverse; ONA condition-by-condition file; restoration after non-convalidation; final debt/proceeds/surplus/accounts; offence-specific mens rea and causation.
Judge / CourtJudicial recognition, Plan/debt, supervision, preservation, inspection, competition and implementation gates must be tested as a continuous record rather than isolated rulings. Ask when the connected valuation/title/control/finance evidence objectively required integrated scrutiny.Exact material before court at each decision; legally available duty/power; objective unlawfulness/arbitrariness threshold if prevarication is alleged; knowledge/intent; causal contribution. Adverse rulings, mistakes or discretion are not criminality.
Chronology lock. CAM's formal LexNET filing of ACTÚA's technical response, id 201810203877878, was on 17-Apr-2018 at 12:27. It cannot itself have caused the 16-Apr-2018 Plan-approval order. The prosecution question is exactly what earlier ACTÚA/CAM/Plan/GESVALT material was before the judge before the order.

Contrary evidence is part of the prosecution file, not something to hide

26 Jun 2018

The judge imposed a genuine stay of realisation for enumerated mortgaged apartments. It is protective contrary evidence, although not whole-hotel possession/exploitation authority.

24 Oct 2019

The court refused to convalidate Protocol 2150 after the already executed transaction. The remaining question is whether cash/title/Registry/competition consequences were effectively restored.

Alternative explanations

Valuation purposes differ; the 2018 Arrecife criminal line was provisionally dismissed and dismissal affirmed; ONA remained conditional; Ottawa did not appear/deposit as required; later investment/refurbishment can create later value.

Removal test. Replace ACTÚA's disputed inputs with verified unit/finca facts; remove unsupported whole-hotel authority; preserve the ONA/finance and real-competition counterfactuals; recalculate lawful debt/value on matched perimeters. If substantially the same CAM outcome survives, the valuation bridge may not be causal. If it does not, identify the exact private, AC or judicial act/omission that made the difference.

Primary proof targets

  1. Complete ACTÚA production file: engagement, requester instructions, invoice, drafts, field notes, native photographs/metadata, inspection attendees and access/key chain.
  2. Provider and exact schedule behind ACTÚA's at least 61 input.
  3. Identity of ACTUA-PHOTO-011/012/013 and full finca/owner/condition geolocation.
  4. Exact ACTÚA Annex I / version trail reconciling €7.065m and €6.608m.
  5. Exact 16-Apr decisional bundle: Plan/version set, annexes, objections/responses and what reached the AC and judge before decision.
  6. GESVALT unit-level basis for ≈44 and proof of circulation/use by AC/court.
  7. ONA/funded-exit condition-by-condition ledger, 7-June impact, 2021 bidder/hearing file and final debt-to-dación ledger.
  8. Protocol 457 five-day receipt, Registry/cancellation implementation, €400k branch, surplus/final accounts and downstream CAM→HNT→RICPE/RIC/public-support/MYND source/use record.

POR DERECHO · Reward careful examination, not agreement.

Test the argument

Optional · inspect the evidence and compare the reasoning. No account, saved answer, transmission, score or voting. Reader responses are not evidence.

TTA-003 · V1 · Reviewed 2026-09-12

Are we comparing like with like?

Which approach represents the valuation dispute fairly before assessing its significance?

Source and status

ACTÚA: January 2018 advice/stated fair value. GESVALT: June 2017 RICS market value; a separate March 2018 expert critique; June 2018 ECO mortgage-purpose valuation following a May inspection. These are not three interchangeable measurements.

Try this exercise · inspect, choose, compare

Project Position

Project Sun Rock alleges that ACTÚA was materially false, fraudulent and misleading in preparation or use, and that disputed premises were used in the path toward control and title. This is an attributed allegation. The actual test is source inputs, sample, depreciation, circulation, institutional use and actor-specific causation; raw valuation differences do not prove it.

Mischaracterisation Risk

“Por Derecho says every lower valuation is necessarily wrong.” This is a deliberately weakened teaching paraphrase, not a statement attributed to an institution or adverse party.

Strongest Contrary Explanation

Different valuation purposes, inspection dates, condition assumptions and methods may legitimately produce different figures. Some criticisms may survive a matched comparison; others may need narrowing.

Best lawful/contrary explanation we can presently formulate; not attributed to the affected party unless and until adopted by them.

Contrary Evidence

ACTÚA records incomplete interior access and supplied information; the later GESVALT inspection cannot fix every January premise. The recovered ACTÚA photo appendix is mixed and does not prove the earlier asserted Blocks 4–5 concentration. That earlier assertion is preserved as weakened/falsified as stated.

Which assessment best fits this precise question?

Read every choice and its explanation
The larger figure settles which report is right

That substitutes a numerical shortcut for the actual argument. Date, purpose, scope, condition, assumptions and use must be matched before drawing a conclusion.

Different purposes make every criticism irrelevant

That also weakens the real issue. Different purposes matter, but a specific factual input or uniform-depreciation criticism can still be tested.

Reconcile scope and assumptions, then test the surviving criticism

This fairly tests both positions and permits the project’s claim to be narrowed or defeated. The contrary explanation shown here is analyst-constructed, not falsely attributed to a valuer or another party.

What the source establishes

Different purposes, dates, methods and documented professional criticisms that require reconciliation. The March critique is not a new market or mortgage valuation.

What it does not establish

The numerical gap alone does not identify an incorrect report or establish intent, institutional reliance or a causal contribution to the later outcome.

Lawful Alternative

A purpose/date/method difference may explain part of the gap. It does not automatically answer a specific criticism of input accuracy or the later use of a report.

Decisive Test

Compare the complete signed versions, instructions, effective valuation and inspection dates, asset schedules, assumptions and unit-level condition/depreciation inputs. Then identify the exact report or premise received and used at each decision.

Evidence Gap

Complete instructions and working files; the source and unit schedule behind “at least 61”; property-level depreciation; the decision-specific transmission/use record.

What Would Change Our View?

Verified inputs and a reproducible matched comparison explaining the disputed result would narrow or defeat that criticism. A surviving input error still needs proof of actual use and causal effect before a wider conclusion.

Proof Ceiling

An evidentiary comparison and attributed causal allegation. A matched comparison may strengthen, narrow or defeat particular criticisms; neither the numerical gap nor the explanation alone decides responsibility.

Current evidential classification: Different purposes; causal significance remains open