OPEN FILE · ALERT ≠ FRAUD · PLAQUE ≠ COMPLETE AUDIT

SNCA / ERDF: reconstruct what was received, what was checked and what expenditure was funded.

This route separates the anti-fraud channel, operation management, accounting/certification, inspection and control. It does not presume fraud or loss to the Union. It requires a reproducible trail from beneficiary and asset to invoice, payment, employment, certification and any correction or recovery.

SNCA file141-2026-IRR02
Controlled receiptREGAGE26e00069678966
Published subsidy€3,440,914.20
FundERDF identified; detail open

ERDF / FEDER · evidence → traceability → action

ERDF / EU funds: what is established, what remains open and what to do next

How to use this page. Traceability route: follow operation, beneficiary, eligible expenditure, payment, certification, verification, correction and any recovery.

Por Derecho visual on ERDF traceability and asset recovery
Editorial action-routing aid; it does not establish fraud, corruption, duplicate funding, EU-budget loss, a PIF nexus, EPPO/OLAF competence or individual liability.
✓
Established

The controlled public record identifies the EU/ERDF connection for the MYND/GC/836/P06 project.

?
Still to produce

Exact operation and percentage, eligible expenditure, invoices, payment/certification, verifications, audits, corrections and recovery.

≠
Keep separate

RIC tax relief, RICPE investment, Regional Incentives, State aid and FEDER/ERDF are not one funding source.

Minimum production needed to close the ERDF question
  1. operation identifier and programme/fund
  2. beneficiary and title/availability record
  3. eligible-cost schedule and invoices/supporting records
  4. funding sources and other aid declared
  5. certifications, payments and verified employment
  6. verifications, audits, issues, corrections or recoveries

Directive (EU) 2024/1260 · FEDER/ERDF · EPPO/OLAF: Editorial action-routing aid; it does not establish fraud, corruption, duplicate funding, EU-budget loss, a PIF nexus, EPPO/OLAF competence or individual liability.

This page is

A traceability and control guide, not a predetermined conclusion.

It organises the alert, Regional Incentives file, ERDF identification, private/RIC funding, asset perimeter, costs and status of each control.

This page is not

Proof of duplicate funding or loss to the EU budget.

An alert proves communication; a plaque proves public fund identification; an award proves the published act. Material outcome requires the file, expenditure, payment and verification.

THE CASE IN 7 MINUTES

Six layers that must remain separate and connected.

1 · alert

SNCA / Infofraud

What information entered, with which attachments, what checks were performed, what was preserved, what was referred and what status followed.

2 · award

GC/836/P06

Hotel New Trend, S.L.; published investment €11,469,714; subsidy €3,440,914.20; 60 jobs.

3 · operation

ERDF identified

The permanent plaque identifies ERDF. Operation identifier, programme, rate, certified expenditure, payment and controls remain open.

4 · asset

Fragmented perimeter

The position documented within RICPE on 20 July 2021 distinguished 54 CAM, 190 LPB and 18 third-party units.

5 · money

Source-and-use

Reconcile RICPE/RIC, subsidy, co-financing, own resources, bank/supplier funding, invoices and payments.

6 · outcome

Verification and correction

Checks, audits, issues, certifications, financial corrections, recoveries and closure, if any.

AUDIT TRAIL

From asset to account: no institutional stamp replaces the previous link.

BeneficiaryHNT, group, related parties and capacity.
AssetUnit, right and availability.
WorkPackage, contract and supplier.
Invoice / paymentLine item, bank, date and amount.
EU expenditureEligibility, certification and rate.
ResultAsset, employment, indicator and use.
ControlVerification, audit, correction and recovery.

Dependency question: at each arrow, was the primary source checked or was an assertion inherited from the applicant, another authority or an earlier file?

WHAT CHANGED?

The 2021 fragmentation must be reconciled with the later funded operation.

20 JUL 2021

54 CAM / 190 LPB / 18 third parties; conditional acquisition, unsigned LOI and full DD not started.

WHAT PERIMETER WAS FUNDED?
AFTERWARDS

HNT/MYND, Regional Incentives support and ERDF identified. Each asset, work, cost, invoice, job and income stream should map to the relevant legal perimeter.

Boundary: fragmentation does not automatically invalidate the operation. It requires the file to show what was included, what was excluded and under which title or consent.

NUMBER CONTROL

Multiple sources are neither added nor normalised without reconciliation.

RICPE / prospectus

€1,598,849.78 works + €4,971,863.78 employment = €6,570,713.56.

Separate accounts reconstruction

€6,573,703.10. Difference from prospectus: €2,989.54, awaiting explanation.

GC/836/P06

Published subsidy €3,440,914.20 on €11,469,714 investment and 60 jobs.

No automatic conclusion: the amounts may concern different components, dates or accounting treatment. Proving overlap requires invoice, cost, asset, payment and period comparison; proving no overlap requires the same table.

DECISION TREE

How to move from an alert to a verifiable conclusion.

SNCA / EU controlStatus should reflect what happened, not the reporter’s expectation.

Is the information concrete?

Fact, file, beneficiary, amount, document, period and potential EU financial interest.

Which body is competent?

SNCA, ERDF management, accounting/certification, Incentives, inspection, IGAE or another.

What was checked?

Primary source, data cross-check, file, visit, invoice, payment or employment.

What outcome followed?

Reasoned closure, request, referral, investigation, correction, recovery or final closure.

MINIMUM PRODUCTION

A file an external auditor can reproduce.

  1. Complete index of 141-2026-IRR02.
  2. Infofraud / REG-AGE reconciliation.
  3. Alert, attachments and intake metadata.
  4. Classification, competence and referrals.
  5. Complete GC/836/P06 file.
  6. Application, memorandum and individual award.
  7. Property/right map and availability.
  8. ERDF operation identifier and operation sheet.
  9. Programme, priority, rate and beneficiary.
  10. Eligible costs and exclusions.
  11. Contracts, suppliers, invoices and payments.
  12. Other-aid and cumulation declarations.
  13. Consolidated source-and-use.
  14. Employment, FTE, persons and periods.
  15. Administrative and on-the-spot checks.
  16. Statements of expenditure and accounting function.
  17. Audits, issues and representations.
  18. Financial corrections and recoveries.
  19. Current status, closure and reasoning.
  20. Exculpatory or no-overlap evidence.

OPEN KIMONO · BEST CONTROL AND WARNING

Protecting the Union’s financial interests requires an open trail, not a black box.

Positive model

Good SNCA / ERDF practice

  • The alert is preserved with attachments and real status.
  • Competence and referral are documented.
  • Operation, beneficiary and expenditure are identified.
  • Invoice, payment, certification and indicator are connected.
  • Other aid and finance are reconciled.
  • Contrary evidence can close or narrow the hypothesis.
  • Correction and recovery, where applicable, remain traceable.
Warning

The opposite practice

  • Channel used as a mailbox without status or custodian.
  • Referral treated as investigation or solution.
  • ERDF plaque used as substitute for the file.
  • Award used as proof of final eligibility.
  • Separate instruments used to avoid an invoice table.
  • Employment declared without persons, period or FTE.
  • Secrecy or silence converted into a merits answer.

Boundary: the comparison does not assert that SNCA, IGAE, DGFE or the regional authority engaged in every negative practice. It defines a public standard the file can meet, correct or fail.

SEPARATE FUNCTIONS

Anti-fraud, management, accounting/certification and control are not synonyms.

SNCA / Infofraud

Channel and anti-fraud function for concrete information on possible irregularities affecting EU funds; receipt is not acceptance.

Official portal / Infofraud →

ERDF management

The official structure assigns selection of operations and systems ensuring compliance of expenditure submitted for co-financing.

Official functions →

Accounting/certification and payments

The function manages statements of expenditure, payment applications, accounts and economic-financial monitoring.

Official functions →

Inspection and Control

Performs checks and proposes corrective measures; it also conducts state inspection/checks for Regional Incentives.

Official functions →

Regional Incentives

Award, conditions, execution, settlement and non-compliance retain their own file and bodies.

Open GC/836/P06 →

Intervención / audit

Public-resource control and applicable audits must remain distinct from anti-fraud intake and management.

Open Intervención →

Series F/G control: Series F/G · suitability → separates the 2022–2023 administrative authorisation, source-specific amounts and use-of-funds questions without treating them as a fraud finding.