ES
POR DERECHO / AC REPORT TRACK

Insolvency administrator reports

Concurso 36/2012 · Luchy Playa Blanca · Sun Park

The report, what was known then, and what happened later. Criminal-first analysis without promoting allegations into established facts.

9PDF121Page6Missing reports and coverage
2016–present is only Phase 1. The 2012 opening and all relevant earlier history, inside and outside the insolvency, remain in scope.
PARTIAL SERIES · OFFICIAL DENOMINATOR NOT CERTIFIED

Public redacted copies retain every page and searchable text. Originals remain private. Redactions protect identifiers, contacts, addresses, accounts and access codes; they do not validate signatures or certify identity with the filed bytes.

Reading method

Before attributing an offence: person/capacity, applicable power and duty, specific conduct, required knowledge and intent, causation and harm, contrary evidence and jurisdiction. An insolvency breach is not automatically a crime.

Complete PDF of this copy; does not certify every annex, cryptographic signature or exact identity with the filed document.

SOURCE → REPORT ASSERTION → ACTUAL NOTICE → OBJECTION → DECISION → APPEAL → IMPLEMENTATION → RECOVERY QUESTION. DISCOVERY DATE ≠ HISTORICAL KNOWLEDGE. MATURITY DATE ≠ PAYMENT DATE.

Questions and links are present retrospective analysis, not an attribution of knowledge at the report date.

The “truth inversion” allegation: test each connection

Gil Marer alleges that attribution of conduct, evidence and harm was inverted in the classification proceedings. Compare the administrator’s assertions, the prosecutor’s position, the judge’s findings and the challenges separately. Institutional repetition does not itself prove a fact; disagreement does not establish an offence.

AC · 2019

Assertions and cited sources

PDF

Fiscal · 2019

Own position and references

PDF

Judgment 163/2023

Findings and legal effects

PDF

Deficit liability

The AC sought deficit liability against Gil; the Fiscal separately requested deficit coverage. The judgment rejected that request for insufficient justification. It nevertheless retained culpable classification and a separate €3,032,010.34 damages award. Rejection of deficit liability was not complete exoneration.

AC · PDF p. 46 · Fiscal · PDF p. 1 · Fiscal · PDF p. 2 · Judgment · PDF p. 25 · Operative result · PDF p. 26 · Damages · PDF p. 27

€737,338.85: assertion and correction

The AC suggested that LPB effectively owed itself approximately 70% of €737,338.85. The judgment accepted expert evidence of a valid LPB receivable and rejected that construction, while retaining adverse findings about the failure to pursue recovery. This correction does not establish criminal intent.

AC · PDF p. 9 · Judgment · PDF p. 10

Gil’s appeal advances grounds on recovery difficulty, profitability, accounting and collaboration. These are the appellant’s arguments; they are not presented as accepted by the appellate court.

Appeal · PDF p. 4 · Appeal · PDF p. 6

Existing claim-by-claim comparison: rejected, narrowed and adverse findings

Retrospective comparisons of the previously published public copies, distinct from the newly recovered annotated working copy. Judicial error induced under CP Article 250.1.7 and a knowingly unjust decision under Article 446 are distinct hypotheses requiring separate proof for each actor and decision.

Classification: matrix, filings and judgment · Appeal: available filings and court acts

Retain adverse decisions and the strongest alternative explanation. A report, its receipt, actual knowledge and judicial adoption are separate facts.

Compare complete PDFs

Choose A and B on the reports to compare them.

All reports

2013-01-15 · INITIAL

Initial report · Article 75 LC

37 PDF pages · 799,961 bytes · ACR-20130115-ART75

Open public PDF Download Document page

At the time · the report’s assertion

The report records the 2012 opening and continuing activity. It also gives an adverse account of delayed document delivery. An administrator's assertion is not a judicially established fact.

PDF p. 3 · PDF p. 4 · PDF p. 37

Afterwards · retrospective reading

Reconstruct the baseline from the 2012 application and opening order, inventory, creditors and earlier operations. The 2013 narrative does not replace 2008 deeds/contracts or 2010–2012 books.

2026-09-12 · context threshold; not a historical notice certificate

Criminal and recovery question

Which rights, income, receivables and obligations did the administrator actually know, when and from which documents?

Discriminating evidence and strongest alternative explanation

Original application/order; complete annexes; books; dated requests, deliveries and receipts. Distinguish absence, delay and availability through other sources.

Related reports: ACR-20190211-CALIFICACION

Law and temporal controls: LC75 · CP2

Documents and procedural links to reconcile

2012-OPENING · PRECONCURSO-TITLE-EXPLOITATION · INITIAL-ANNEXES

This copy’s fingerprintc0d020a310a988836677feb0de8b001dcad53118b664ae96b2562b4ad561e31d
Provenance and notice

Filing / service / actual knowledge: verification pending.

2018-09-20 · LIQUIDATION

Liquidation report · 20 September 2018

1 PDF pages · 68,708 bytes · ACR-20180920-LIQ

Open public PDF Download Document page

At the time · the report’s assertion

The administrator invokes the 26 June stay and asserts a lack of funds and no payments during the insolvency. This is a dated assertion, not this page's finding.

PDF p. 1

Afterwards · retrospective reading

The fourth report describes receipt of the November price and subsequent fee payments. Timing may explain the change: an earlier maturity date in a table does not prove an earlier payment.

2018-12-20 · context threshold; not a historical notice certificate

Criminal and recovery question

Did reporting, actual control and cash movements match after 7 June?

Discriminating evidence and strongest alternative explanation

Full statements and value dates; payment/fee orders; the stay and its material scope. A missing statement does not prove concealment.

Related reports: ACR-20181220-Q4 · ACR-20210721-LIQ

Law and temporal controls: LC152 · CP252

Documents and procedural links to reconcile

2018-CONTROL-NOTICE · BANK-PAYMENT-CHAIN

This copy’s fingerprint5eb100d89583f5c6cd68c1ba0ba3746d78969e7306a898404631da2983d22d6a
Provenance and notice

Filing / service / actual knowledge: verification pending.

2018-12-20 · LIQUIDATION

Fourth report · sale and use of proceeds

8 PDF pages · 347,798 bytes · ACR-20181220-Q4

Open public PDF Download Document page

At the time · the report’s assertion

PDF page 7 (printed 6) records the administrator's account of the 28 November 2018 sale for EUR400,000 and payment of his fees after collection. It attributes missing support for certain receivables to the debtor. The filename does not make this a one-page extract.

PDF p. 6 · PDF p. 7 · PDF p. 8

Afterwards · retrospective reading

Compare the deed, ob-rem clause, plan/stay, 24 October 2019 non-convalidation decision and subsequent use. Non-convalidation alone does not establish actual restitution.

2019-10-24 · context threshold; not a historical notice certificate

Criminal and recovery question

Did the account to the court accurately reflect the scope of authority and lawful use of proceeds?

Discriminating evidence and strongest alternative explanation

Deed 2150/2018; plan and orders; cheque, statements, invoices, priority and authorisations. Test, rather than caricature, the explanation of action authorised by the plan.

Related reports: ACR-20180920-LIQ · ACR-20190620-Q6 · ACR-20210721-LIQ

Law and temporal controls: LC152 · CP252 · CP250

Documents and procedural links to reconcile

OBREM-DEED-2150 · NONCONVALIDATION-20191024 · BANK-PAYMENT-CHAIN

C36-E021

This copy’s fingerprint639f8650db4e609b61b0ae3aa7e689e08f5bd45b00e5a9a4cd67a882bb01f261
Provenance and notice

Filing / service / actual knowledge: verification pending.

2019-02-11 · CLASSIFICATION

Classification report · 47 pages

47 PDF pages · 1,150,384 bytes · ACR-20190211-CALIFICACION

Open public PDF Download Document page

Annotated working copy: 303 PDF annotations and their metadata were removed. Notes already embedded in page content remain; they are not automatically attributed to the administrator. Identity with the filed document is not certified. The procedural comparison also links the other previously published public copy.

At the time · the report’s assertion

The administrator's accusatory report/proposal in section six must be separated by person, period, conduct, evidence and requested relief. Receipt and the fiscal opinion are distinct acts; neither automatically turns assertions into truth.

PDF p. 1 · PDF p. 47

Afterwards · retrospective reading

The transparency ledger distinguishes rejected allegations and adverse findings in judgment 163/2023: partial rejection is not complete exoneration. Keep the 2019 oppositions, hearing, judgment and appeal as separate objects. Current appeal status was not verified in this intake.

2023-09-28 · context threshold; not a historical notice certificate

Criminal and recovery question

Was there a material falsehood knowingly used, or a disputed/rejected allegation without established intent?

Discriminating evidence and strongest alternative explanation

Statement–source–knowledge–use–decision–harm matrix, retaining contrary evidence and all adverse findings. Do not conflate insolvency intent, gross negligence and criminal intent.

Related reports: ACR-20130115-ART75 · ACR-20181220-Q4

Law and temporal controls: LC169 · CP250 · CPFALSE · CP2

Documents and procedural links to reconcile

CALIFICACION-ANNEXES · 2019-OPPOSITIONS · 2023-JUDGMENT-APPEAL

This copy’s fingerprint76e031077dfdb0045db5c1b067bb15ac49d559ae6dc4806d9a4a3d20d628434b
Provenance and notice

Filing / service / actual knowledge: verification pending.

2019-06-20 · LIQUIDATION

Sixth report · version dated 20 June 2019

8 PDF pages · 317,598 bytes · ACR-20190620-Q6

Open public PDF Download Document page

At the time · the report’s assertion

The last page says it is prudent not to begin insolvency-credit payments before the appeal against the 16 April 2018 order is decided. Distinguish those payments from estate expenses and fees.

PDF p. 8

Afterwards · retrospective reading

A different PDF is also labelled sixth report and already refers to terms set by the appellate court. Preserve both versions and establish which was filed and served.

2026-09-12 · context threshold; not a historical notice certificate

Criminal and recovery question

Are these successive versions, a correction or a labelling collision?

Discriminating evidence and strongest alternative explanation

Signatures and receipts with principal/annex hashes; court register and service. Different bytes do not prove criminal manipulation.

Related reports: ACR-Q6-UNDATED-VARIANT · ACR-20181220-Q4

Law and temporal controls: LC152 · CP252

Documents and procedural links to reconcile

Q6-VARIANT-RECONCILIATION

This copy’s fingerprint6ecbff358c7f0301c50492d66ad1fffda63b61bd7a00bef1667797c5159330c4
Provenance and notice

Filing / service / actual knowledge: verification pending.

Date unresolved · VARIANT

Sixth report · another version, date unresolved

8 PDF pages · 342,741 bytes · ACR-Q6-UNDATED-VARIANT

Open public PDF Download Document page

At the time · the report’s assertion

The last page refers to the electronic-signature date and disposal on terms set by the appellate court. Creation metadata dated 26 September 2019 do not prove signature, filing or third-party knowledge dates.

PDF p. 8

Afterwards · retrospective reading

Variant preserved without merging it into the June file or inventing a seventh or eighth report. It is not independent corroboration of itself.

2026-09-12 · context threshold; not a historical notice certificate

Criminal and recovery question

Which complete version actually entered the proceeding?

Discriminating evidence and strongest alternative explanation

Verifiable signed original, LexNET hash, annexes and communications. Keep the unknown date visible.

Related reports: ACR-20190620-Q6

Law and temporal controls: LC152 · CPFALSE

Documents and procedural links to reconcile

Q6-VARIANT-RECONCILIATION

This copy’s fingerprint91c107fecc4ef4e1b9779b757bdc042cbaef6a0c2750895fb80635feb8f8cc97
Provenance and notice

Filing / service / actual knowledge: verification pending.

2021-07-21 · LIQUIDATION

Article 424 report · 21 July 2021

4 PDF pages · 244,602 bytes · ACR-20210721-LIQ

Open public PDF Download Document page

At the time · the report’s assertion

A liquidation-operations report, NOT a classification report. It says the 18 May 2021 order is not final; records the potential swap claim and attributes no response about its status to the debtor (LPB). The payment table contains a maturity-date column.

PDF p. 1 · PDF p. 2 · PDF p. 3 · PDF p. 4

Afterwards · retrospective reading

Compare the finality change with the October report and the actual decisions. Link swap recovery to earlier financing and both sides' requests and responses.

2021-10-25 · context threshold; not a historical notice certificate

Criminal and recovery question

Was a viable recovery claim preserved and explained, and was procedural status accurately reported?

Discriminating evidence and strongest alternative explanation

18 May/15 October orders; receipts; swap opinions; claim funding; authorisations and replies. A lawful procedural change may explain the difference.

Related reports: ACR-20211025-LIQ · ACR-20220125-LIQ

Law and temporal controls: TRLC424 · CP252 · CP250

Documents and procedural links to reconcile

SWAP-2008-RECOVERY · 2021-FINALITY-CHAIN

C36-FIL-2021-07-21-AC-REPORT

This copy’s fingerprint7e072b19f944c2c0a18b913773f9ec3a5a4661bc5b2ce309781bd6cbdede4fe7
Provenance and notice

Filing / service / actual knowledge: verification pending.

2021-10-25 · LIQUIDATION

Article 424 report · 25 October 2021

4 PDF pages · 244,257 bytes · ACR-20211025-LIQ

Open public PDF Download Document page

At the time · the report’s assertion

The administrator asserts finality following dismissal of reconsideration on 15 October and says execution of the deed remains pending. It retains the swap claim and his no-response account. This assertion is not a court finality certificate.

PDF p. 1 · PDF p. 2 · PDF p. 3 · PDF p. 4

Afterwards · retrospective reading

January distinguishes that finality from other pending challenges to the 25 October court-office order. Register 7425/2021 must be reconciled as possible receipt of this report, not automatically counted as another report.

2022-01-25 · context threshold; not a historical notice certificate

Criminal and recovery question

Which specific decision, appeal and effect supported each finality assertion?

Discriminating evidence and strongest alternative explanation

Separate 15 and 25 October objects, challenge, service date and use in the deed; test the alternative of distinct decisions.

Related reports: ACR-20210721-LIQ · ACR-20220125-LIQ

Law and temporal controls: TRLC424 · CP250

Documents and procedural links to reconcile

2021-FINALITY-CHAIN · RECEIPT-7425-2021

C36-FIL-2021-10-25-AC-REPORT

This copy’s fingerprintc0c816094f03de1e31911c8a23824e186c9d1fe173460655598f01af5c828802
Provenance and notice

Filing / service / actual knowledge: verification pending.

2022-01-25 · LIQUIDATION

Article 424 report · 25 January 2022

4 PDF pages · 238,526 bytes · ACR-20220125-LIQ

Open public PDF Download Document page

At the time · the report’s assertion

It links the pending deed to challenges to the 25 October office order and repeats the purchaser's assumption of costs and community charges. Community charges are excluded from the table by reference to the plan.

PDF p. 1 · PDF p. 2 · PDF p. 3 · PDF p. 4

Afterwards · retrospective reading

Link to the 31 January office order, register 547/2022, later decisions, deed 457/2022 and the April report still to recover. The email alone does not establish service on every creditor.

2026-09-12 · context threshold; not a historical notice certificate

Criminal and recovery question

Were the stated conditions performed, and who actually bore costs, charges and loss of value?

Discriminating evidence and strongest alternative explanation

Signed principal and receipt547; deed and settlements; purchaser payment evidence; April report; challenges and implementation. Distinguish contractual allocation, actual payment and harm.

Related reports: ACR-20211025-LIQ

Law and temporal controls: TRLC424 · CP252 · CP250

Documents and procedural links to reconcile

RECEIPT-547-2022 · ACR-GAP-20220425 · DEED-457-2022

C36-E049

This copy’s fingerprintba104fc2552888f0f5bb93dcf989bcfaded327a886f79b23d7013ef833bd8fb1
Provenance and notice

Filing / service / actual knowledge: verification pending.

Copy recovered in this pass from an email dated 2 February 2022. Counsel transmission, not a certificate of service on everyone.

Missing reports and coverage

A reference or receipt is not the report’s contents. Missing from this package does not mean never filed. Close the series against the official docket, each principal, its annexes, receipt, service and subsequent treatment.

2012–2017 reports, annexes and updates

ACR-GAP-EARLY-SERIES · DENOMINATOR_AND_ORIGINALS_OPEN ·

Fifth/eighth and other quarterlies: reconcile numbering

ACR-GAP-Q5-Q8 · REFERENCED_FAMILIES_NOT_ACQUIRED_HERE · historic-filing-rows-600-601-602

2020 series and related objections

ACR-GAP-2020 · REPORT_PRINCIPALS_AND_SERVICE_OPEN ·

25 April 2022 report

ACR-GAP-20220425 · CONTROLLED_REFERENCE_NATIVE_NOT_RECOVERED_HERE · C36-ACR-2022-04-25

Report mentioned in 27 July 2022 office order, register5367

ACR-GAP-5367-2022 · RECEIPT_REFERENCE_NOT_REPORT_CONTENT · C36-ACR-5367-2022

Later reports, final report and accounts

ACR-GAP-LATER-FINAL · OFFICIAL_DOCKET_RECONCILIATION_REQUIRED · C36-ACR-LATER-FINAL

Law and temporal controls

BOE · 2026-09-12 · The report date alone does not settle transitional applicability.

LC 22/2003 · arts. 35–36, 43–44, 74–75

Initial report and accompanying documents; diligence, preservation and continuity. Verify the applicable 2012–2013 text and regime.

LC 22/2003 · arts. 148, 152

Liquidation operations, periodicity, maturity dates, communication and completion; compare authority and execution.

LC 22/2003 · art. 169

Classification: documented reasoning, persons, grounds and damage. Not a liquidation report.

TRLC 1/2020 · art. 424; Ley 16/2022 · DT1

Article 424: quarterly liquidation reports. For later acts, also examine transitional rules rather than automatically applying today’s text.

Código Penal · art. 2

Temporal legality and more favourable criminal law.

Código Penal · art. 252

Disloyal administration: power, excess and harm; check the 2015 reform.

Código Penal · art. 250.1.7

Procedural fraud: causative procedural deception, not mere disagreement.

Código Penal · arts. 390, 392, 395

Falsification: document category and statutory conduct; 392 does not incorporate 390.1.4.

Código Penal · art. 423

Bribery: includes insolvency administrators; identify and prove the applicable subtype under Articles 419–422, including, where applicable, a gift accepted in consideration of office. It does not make every administrator’s act a judicial act.

Código Penal · art. 446

Judicial prevarication: judge and knowingly unjust decision; separate authorship.

Ley 16/2022 · disposición transitoria primera

Procedural context and related routes